14 / 19

Newsroom

Notice

Notices

Notice for Accurate Guidance

Provides standards for website information, inquiry channels, and methods for posting future announcements.

Scroll
Notice Board

Clear guidance,
focused on what you need.

Guide

Guide for preparing materials for quotation review

Please provide the site name, location, client or contractor, furniture work type, planned number of units/quantity, desired delivery schedule, and whether drawings/specifications are available.

If it is an early stage where drawings are not yet finalized, indicating the currently verifiable range and the future finalization schedule helps establish the review premise.

View all preparation items
Notice

Instructions for website material display and use.

The company's basic information, history, production facilities, construction achievements, certifications, and awards are compiled based on the 2026 company credentials and public institution data.

Factory, equipment, and evidence images are materials provided by the company, and product or space concept images are separately indicated with captions. Please request the latest original evidence required for contracts or bids from the person in charge.

Guide

Project and quotation Inquiry Guide

Providing the project name, site location, furniture type, planned quantity, desired delivery schedule, and whether drawings are available makes consultation more accurate.

For inquiries, please contact the main phone number 031-988-5732·5733 or email haejoonc@naver.com.

Recruitment

CAD design · quality control recruitment information

On the external recruitment platform, full-time positions for furniture design (CAD) and quality control have been posted as ongoing recruitment. It is indicated that both new and experienced applicants can apply regardless of career and educational background.

External notices may change or close early depending on the company's circumstances, so please make sure to check the latest application status and working conditions before applying.

View Recruitment Information Details
Visit

Headquarters and Factory Visit and Filming Guide

For production schedules and safety, please first consult with the person in charge about the visit date and time, purpose, personnel, type of vehicle, and the process you want to check.

Entry and turning conditions for large vehicles and the range allowed for photographing production facilities may vary depending on operational and security conditions on the day of the visit.

Directions · Preparing for Visit
Resource Desk

Choose resources that match your purpose
before submitting or sharing.

Information Desk

Check the latest notices and data standards before making an inquiry.

01 / Projectquotation inquiry

Required project information and how to submit

02 / DocumentUse of Data

Distinction between public version and submission version

03 / RecruitJob Announcement

Job, period, and method of published recruitment

Information used for contracts and bids must be rechecked with the latest original, not the reduced version on the website.

Project Review Guide
Instruction image organized to separate quotation drawings and document files, portfolio, and items to prepare for factory visits
INFORMATION DESK · AI CONCEPT VISUAL
Frequently Asked Questions

Notice
Frequently Asked Questions.

Key questions and next steps are summarized below.

Q01What can be checked in the notices?

You can check the project inquiry preparation materials, the criteria for using publicly available website materials, recruitment, and major operation guidelines.

Q02What information should be prepared before making a quotation inquiry?

Please prepare the site name, location, furniture work type, planned quantity, drawings/specifications, estimate, and desired delivery schedule.

Q03Can documents on the website be used directly for bidding?

The public version may be for viewing purposes, so the latest submission version with confirmed reference date and validity should be used for contracts and bids.

Q04Where can I check job announcements?

Please check the notices and recruitment information together, and for announcements on external platforms, verify the application status again before applying.

Q05Where should I ask questions about the notice content?

If you leave the title of the relevant notice and the content you want to check in the main email or project inquiry, the person in charge will confirm the responsible scope.

Project Inquiry

Have drawings, quantities and a schedule?
We can begin the review.

Please prepare the project name, site location, furniture scope, estimated quantity, target delivery date and available drawings.

Project Review Guide031 988 5732Email Us