HAEJOO NC Gimpo Headquarters Office Building
06 / 19

Company

Location

Location

Gimpo Production Campus

The headquarters and the production factory are in the same location. For first-time visitors, use of a vehicle is recommended, and if using public transportation, please check the last leg of your journey in advance.

Scroll
Head Office & Factory

Daegot-myeon, Gimpo-si, Gyeonggi-do
307, Daegot-ro 331beon-gil

Last entry criteriaAbout 2KM near Seokjeong Elementary School

Please enter the full road name address in the navigation.

Fax
031-988-5734
Visit Guide
Please consult with the person in charge about the schedule and vehicle information before visiting the factory.
Actual tidy view of HAEJOO NC Production Plant
PRODUCTION CAMPUS · ACTUAL PHOTOGRAPH
Actual view of HAEJOO NC Office Building with perspective and exposure corrected
HEAD OFFICE · ACTUAL PHOTO
Final Approach Guide

From the Seokjeong Elementary School area,
HAEJOO NC is approximately 2 km away.

Travel north from Daegot, take the left road just before Seokjeong Elementary School, then turn left again after Dolumul Ranch and continue to HAEJOO NC.

HAEJOO NC · GIMPOLocation

Coming up from Daegok direction, turn left just before Seokjeong Elementary School,
Pass Dolumul Ranch and turn left again.

Guide map starting from Daegok direction heading north, turn left just before Seokjeong Elementary School, pass Dolumool Ranch, and continue to Haiju NC building modelLANDMARKSeokjeong Elementary SchoolLANDMARKSeokjeong 1-ri Village Hall01Passing Doluwool Ranch02Turn left03Arrival at HAEJOO NCDirection toward Ganghwa-doDaegok-roDaegot direction
VISITOR WAYFINDING MAP · CORRECTED ROUTE

Reflected entry directions and two left turns based on the company-provided guidance.

01 / ApproachMoving north from Daegok direction

Go up along Daegot-ro toward Ganghwa Island.

02 / First LeftTurn left just before Seokjeong Elementary School

Enter the left road before passing the school.

03 / Second LeftTurn left after passing Dolumul Ranch

After passing the pasture, turn left at the fork.

04 / CampusHAEJOO NC

This is the location showing a model of a building at the end of a curved road.

Route Source

Based on the actual routes marked on the map provided by the company, poster-style guide illustrations were created. Surrounding road conditions may change, so street addresses and map app guidance on the day are the final reference.

Arrival Information 031-988-5732
Recommended Arrival

For most visitors,
driving is the most convenient option.

02 / BusTransfer Required

Gurae Station · Bus 60-3 Connection

You can get off at Songma 3-ri using Bus 60-3 heading toward Daemyeong Port from Gurae Station. Please prepare separate transportation from the bus stop to your workplace.

  1. 1

    Confirm the Daemyeong Port directionCheck the operation direction of Bus 60-3 from Gurae Station

  2. 2

    Songma 3-ri StopBefore getting off, inform the person in charge of your current location and estimated arrival

  3. 3

    Last Section MovementUsing a Taxi or Pre-Arranged Pickup Recommended

03 / RailTaxi Recommended

Connection with Gimpo Gold Line

Transfers on public transportation are guided based on Gurae Station, and direct taxi rides are guided based on Gurae Station or Yangchon Station. Walking the entire distance from the station to the company is not recommended.

  1. 1

    Gurae StationTransfer station or taxi-movable standard station for bus 60-3

  2. 2

    Yangchon StationCheck Vehicle Availability Before Using Taxi

  3. 3

    Plan your return tripConfirm the visit end time and return transportation in advance

Transit NoticePublic transportation routes and schedules are subject to change.

This is a guideline. On the day of the visit, check the real-time route on Naver Map or KakaoMap, and consult with the person in charge about how to move after getting off.

Public Transport Route

From Gurae Station
The order of arrival by bus.

  1. 01
    RailGimpo Gold Line Gurae Station

    After getting off, check the real-time arrival of 60-3 and boarding location on the map app.

  2. 02
    Bus60-3 · Towards Daemyeong Port

    Make sure the destination displays 'Daemyeong Port' to avoid boarding in the opposite direction.

  3. 03
    StopSongma 3-ri · 35031

    Check real-time operation information from Gurae Station 35196 bus stop to Songma 3-ri 35031 bus stop.

  4. 04
    Last MileTaxi · Pre-Pickup

    It is difficult to judge the walking conditions from the bus stop to the workplace, so vehicle connection is recommended.

Vehicle Approach

Passenger cars and trucks
Preparation is different.

01 / Passenger Vehicle

Meeting · Factory Inspection Visit

When moving based on the full street address rather than the company name search result, you can reduce destination confusion.

  • NavigationEnter full 307, Daegot-ro 331beon-gil
  • Expected ArrivalInform the person in charge of the changed time in case of delay
  • Arrival nearbyIf the entry/parking location is unclear, check the main phone number
  • Visit MaterialsPrepare drawings, specifications, samples, and questions for confirmation
02 / Freight Vehicle

Delivery · Materials · Large vehicle visits

Depending on the vehicle size and work method, the entry, waiting, and unloading locations may vary, so please consult before dispatch.

  • Vehicle InformationTonnage, Vehicle Length, License Plate Number, and Driver Contact Information
  • Purpose of visitDelivery, loading, and collection items and estimated working time
  • On-site conditionsPre-check of entry, turnaround, and possible waiting locations
  • Arrival ContactContact the person in charge before entering near the business site
Need Direction?If the road is unclear near the destination, do not force entry.

If you let us know your current location and vehicle type, the person in charge will check the entry direction for you.

031-988-5732
Before Departure

Before arrival,
share these four details.

  1. 01Visit Date and Time

    Desired date and expected arrival time

  2. 02Purpose · Personnel

    Project meetings, equipment·sample checks, and visiting personnel

  3. 03Vehicle Information

    Vehicle number and whether it is a passenger, cargo, or large vehicle

  4. 04Verification scope

    Desired process, required preparation materials and whether filming is necessary

Factory Visit

For production schedules and safety, please depart only after the visit is confirmed.

Please check with the person in charge first if visiting or delivering with a large vehicle about entry and turning conditions. The scope of factory inspection and whether photography is allowed may vary depending on the production and security conditions on the day.

Visit/Project Inquiries
Factory Visit

If you provide the purpose of the visit, the consultation will be faster.

01 / MeetingProject Consultation

Review of drawings, work types, and schedule

02 / FactoryVerification of production base

Consultation on the scope for checking major facilities and processes

03 / MaterialSample·Finish Consultation

Prepare material information to compare with the specifications

Since this is a factory in operation, please coordinate with the person in charge regarding the schedule and scope of confirmation before visiting.

Project Review Guide
Frequently Asked Questions

Location
Frequently Asked Questions.

Key questions and next steps are summarized below.

Q01What are the addresses of HAEJOO NC headquarters and factory?

307, Daegot-ro 331beon-gil, Daegot-myeon, Gimpo-si, Gyeonggi-do, where the headquarters office and production factory are in the same business premises.

Q02Do I need a reservation to visit the factory?

For production schedules and safety management, you must consult in advance regarding the purpose of visit, desired date and time, and information about personnel and vehicles.

Q03Is it possible to visit using only public transportation?

Additional transportation may be required from nearby bus stops and railway stations, so please check the traffic guide in the directions and review your route before departure.

Q04What should be checked when a vehicle visits?

Please check the entry route and parking location of the Daegot-myeon workplace, and inform us in advance if large vehicles or multiple vehicles will visit.

Q05What should I bring when visiting for a project consultation?

Preparing drawings, work types, planned quantities, schedule, final specifications, and a list of equipment/processes to check will speed up the consultation.

Project Inquiry

Have drawings, quantities and a schedule?
We can begin the review.

Please prepare the project name, site location, furniture scope, estimated quantity, target delivery date and available drawings.

Project Review Guide031 988 5732Email Us