HAEJOO NC kitchen cabinetry e-Catalog Main Image
15 / 19

E-Catalog

E-Catalog

Company & Product Overview

Review our company profile, product range, manufacturing capabilities, quality systems and project experience in one document.

Scroll
HAEJOO NC E-CATALOG · PUBLIC EDITION 2026

The evidence required for vendor review,
organized in one document.

The 30-page public catalog covers the company profile, CEO message, product range, production campus, manufacturing process, quality and R&D systems, awards, and project records from 2005 to 2026. Personal identifiers, full registration numbers, seals, and confidential credit or financial information are excluded.

Edition
2026.08
Format
PDF · 30 Pages
Scope
Public Review
Contents

Follow the procurement review flow
to find the information you need.

01 / Executive Review

When evaluating HAEJOO NC,
start with these five points.

0127 Years

Continuous Project Experience

Since 1999, we have built extensive experience across public and private apartment furniture projects.

029,290㎡

Company-Owned Production Base

Our Gimpo production campus and dedicated processing equipment give us direct control over manufacturing conditions.

03One Flow

Integrated Project Delivery

We connect drawing and specification review with production, delivery, installation coordination and final inspection.

04KS · ISO

Verifiable standards

You can separately verify product standards, quality·environment·occupational health and safety management systems, and public evidence.

05209 Records

Searchable Project Records

Search project records from 2005 to 2026 by site name, contractor, year and furniture scope.

HAEJOO NC Official Logo

The figures and names in the catalog have been organized based on the current website and 2026 company data. The actual supply range and schedule will be finalized after reviewing drawings, quantities, and on-site conditions.

02 / Company & Business

Continuing since 1999
Based on multi-family housing furniture performance.

HAEJOO NC Gimpo Production Campus Actual View
GIMPO PRODUCTION CAMPUS · ACTUAL PHOTOGRAPH

HAEJOO NC is a manufacturing company that connects the review of drawings, production, delivery, and installation consultation of kitchens, storage, and general furniture for multi-family housing.

Established
1999.04
Factory
9,290 m² company-owned factory
Products
Kitchen · Storage · General Furniture
Location
Daegot-myeon, Gimpo-si, Gyeonggi-do
01 / Manufacturing

Furniture Manufacturing

We produce kitchen · storage · general furniture in-house according to approved project drawings and specifications.

02 / Project Supply

Contract Project Supply

We coordinate supply scope around the quantities, unit types and schedules of apartment developments and public-sector projects.

03 / Installation

On-site installation

Check delivery, hoisting, and preceding work conditions and manage installation and finishing according to the contract scope.

04 / Remodeling

Replacement·Remodeling

Check the dimensions of the existing space and the demolition/equipment conditions to review the scope of furniture replacement and remodeling.

  1. Establishment of HAEJOO NCStarting a Furniture Manufacturing Business

  2. Expansion of Gimpo production baseDaegot-myeon In-house Factory Production

  3. Quality, Licenses, and Research FoundationISO, specialized construction industry, KS, dedicated research and development department

  4. Public Quality PerformanceLH Customer Quality Award, Minister and Presidential Commendation

  5. Expansion of Production BaseConstruction of Factory Building 2, Selected as IBK Family

  6. Continuing Public and Private PerformanceAccumulation of additional equipment and project experience

03 / Organization

Specialized responsibilities,
connected project information.

ExecutiveChief Executive Officer
01

Sales Department

Estimation Team · Sales Team

02

Production Department

Production Management Team · Production Team 1

03

Management Department

General Affairs Team · Accounting Team · Purchasing Team

04

Research and Development

Research and Development Team

05

Quality Control Department

Quality Control Team

2026 COMPANY MATERIAL

Technology·Job personnel composition

Qualified personnel and job personnel may overlap, so it is not interpreted as a simple total number.

Furniture Manufacturing Technician
1
Building Painting Technician
5
Construction Carpentry Technician
1
Level 2 Furniture Design & Drafting
1
Skilled Production Personnel
35
Management Personnel
13
01Sales · Estimates

Receive site, work type, quantity, and schedule

02Design · Research

Reviewing drawing, specification, and interference conditions

03Production · Purchasing

Linking material, process, and shipping plans

04Quality · On-site

Inspection, installation, and correction history management

04 / Product Range

Before Item Name
Check review conditions.

Suggested Images for kitchen cabinetry Production Direction
01 / Kitchen

Kitchen Cabinetry

Sink · Upper and lower cabinets · Refrigerator cabinet · Island

Layout
Floor and elevation plans, circulation routes, and equipment layout
Specification
Surface materials, doors, countertops, and hardware
Site Check
Facility location, wall and floor interference, and installation
Approval
Approved Drawings and Sample Standards by Type
Suggested Images for Built-in and General Furniture Production Directions
02 / Built-in

Built-in · general furniture

Built-in Closet · Dressing Room Cabinet · General Household Furniture

Layout
Wall length, ceiling height, and interior modules
Specification
Door style, handles, and internal configuration
Site Check
Baseboards, moldings, door trim, and interference conditions
Approval
Finalizing internal storage configuration and hardware
Proposed Image for the Direction of Entryway & General Storage Furniture Production
03 / Storage

Entryway & General Storage

Entrance Closet · Pantry · Half Closet

Layout
Storage purpose, cabinet depth and unit type
Specification
Shelf, ventilation, door, and accessory configuration
Site Check
Allowance for distribution panels, equipment, and floor finishing
Approval
Internal Configuration and Finishing Standards by Type
PROJECT REVIEW POINTS

Drawing Completion

Number of households · types

Surface materials·Hardware

Delivery section

Lifting and installation conditions

Approval Schedule

Product images are suggested images to explain the scope of production. Actual delivery specifications are confirmed through project approval drawings and contract terms.

05 / Production

Connected equipment supports
volume and delivery control.

Factory9,290㎡

Gimpo in-house factory

Cutting6

CNC Cutter

Edge10

Edge Bander

Boring11

Multi·Skipper·General·16-axis total

NC2

NC processing machine

Membrane3

Membrane machine

  1. 01Drawing·Material Check
  2. 02Cutting
  3. 03NC·Edge
  4. 04Boring
  5. 05Assembly · Quality Check
  6. 06Packaging & Dispatch
06 / Quality & Evidence

By standards rather than claims,
Based on publicly available grounds.

01 / System

Management and Production System

ISO 9001·14001·45001, factory registration, professional construction, MAIN-BIZ·INNO-BIZ

02 / Product

Product and standard criteria

KS G 5700·2020, group standards, excellent group standard products, excellent procurement joint trademark

03 / Capability

Research · Quality Organization

Dedicated research and development department, quality control department, and step-by-step process verification

Scene from the 2018 LH Customer Quality Awards ceremony
2018 LH CUSTOMER QUALITY AWARD
Public Evidence
16
Public evidence for transaction review
Recognition
31
Records of Awards, Quality, Audits, and Cooperation

Document numbers, personal identifiable information, official seals, credit·financial data are not published in public catalogs. The original for submission is provided after confirming the submission destination and purpose of use and agreeing on the scope of provision.

2017 Gimpo City Small and Medium Business Award2018 LH Customer Quality Awards, Encouragement Award2021 Model Taxpayer Presidential Citation2024 On-Site Safety Activity Award2025 Excellent Cooperation Award2026 Safety·Quality·Installation Commendation
07 / Partners & Track Record

More than the logos,
project records provide the evidence.

LH
Daewoo Construction
DL E&C
POSCO E&C
SK Ecoplant
Hoban Construction
DL Construction
Daebang Construction
Kolon Global
Dongbu Construction
Seohee Construction
Bando Construction

The logo is intended to identify major institutions or construction companies confirmed via registered partners or construction project records. It does not imply any guarantee or partnership advertisement of the company.

Total Project Records
209 Projects
2005—2026
Latest Reference Year
2026
Reflect additional confirmation performance
Search conditions
Four types
Year · Ordering/Construction Company · Site · Type of Work
Kolon Global

Ulsan Yaeum New Construction

Storage furniture

LH

Remodeling Construction Zone 5 (Jeonbuk)

Storage furniture

LH · DL Construction

Chungnam Provincial Office, Naepo New Town RH-12BL

Kitchen Cabinetry

LH · Far East Construction

Sejong Administrative City 51-3BL

Kitchen Cabinetry

POSCO E&C

Jeonju Eco City The Sharp Phase 4

General Furniture

Hoban Construction

Gwangju Central Park District 2

General Furniture

All 209 Projects can be searched on the performance page by site name, construction company, or work type.

Search all project portfolio
08 / Request Kit

After reviewing the catalog,,
send us these six items.

01

Site Name · Location

Project name, address, client·contractor

02

Furniture Scope

Kitchen, Storage, General Furniture and Detailed Items

03

Planned Quantity

Number of units, number of types, and quantity per item

04

Drawings · Specifications

Floor plan, elevation, detailed drawing, specifications, and finishing standards

05

Desired schedule

Quotation, approval, production and delivery milestones

06

On-site conditions

Delivery access, hoisting requirements, installation zones and coordination items

  1. 01Inquiry Received

    Delivery of Basic Information and Data

  2. 02Initial Review

    Check work type, quantity, and schedule

  3. 03Follow-up Check

    Organizing questions on drawings and specifications

  4. 04Scope Coordination

    Distinction of production, supply, and installation

  5. 05Quotation Review

    Proceed based on confirmed condition criteria

PROJECT INQUIRY

If you have drawings and schedules
We can begin the review.

Do not attach documents containing sensitive personal information.

Call031-988-5732Emailhaejoonc@naver.comOnlineRequest for Project Review ↗
Important

This catalog provides an overview of the company and its product capabilities.

The actual production scope, amount, and delivery are discussed after reviewing project drawings, specifications, quantities, site conditions, and production schedule.

Next Step

Please send the project requirements after checking the catalog.

01 / ReviewCompany & product review

Company, product lines, facilities, and quality system

02 / SelectIndicate the relevant scope

Required items and verification of similar achievements

03 / RequestProject Inquiry

Request review with attached drawings and schedule information

The catalog provides an overview of the company and products, and the actual quotation will be negotiated after reviewing drawings, specifications, quantities, and schedule.

Project Review Guide
Frequently Asked Questions

e-Catalog
Frequently Asked Questions.

Key questions and next steps are summarized below.

Q01What content is included in the e-Catalog?

Review HAEJOO NC's company profile, apartment furniture range, production facilities, quality systems and major project credentials in one document.

Q02Can I download the catalog as a PDF?

Download the public English company profile PDF or browse the full-screen e-catalog.

Q03Can I receive a quotation based on the catalog alone?

The catalog introduces our company and product scope. A formal quotation requires project drawings, specifications, quantities and schedule details.

Q04How can I request the original company credentials?

Include the recipient, purpose, required date and document list in your inquiry so we can confirm which original materials can be provided.

Q05After reviewing the catalog,, what is the next step?

Identify the required furniture scope and relevant project references, then send the site information, drawings, quantities and target schedule.

Project Inquiry

Have drawings, quantities and a schedule?
We can begin the review.

Please prepare the project name, site location, furniture scope, estimated quantity, target delivery date and available drawings.

Project Review Guide031 988 5732Email Us